Software Engineering (SE), T.E. (I.T.), Semester 6, May 2012
Con. 4045-12.
GN-7328
(3 Hours)
[Total Marks: 100]
N.B.: (1) Question no 1 is compulsory.(2) Attempt any four questions out of remaining six questions.
(3) All questions carry equal marks.
(4) Assume suitable data if necessary.
1. A system is designed for evaluation of various tenders received by an organization. It had various steps like data entry of bids, tabulation of bids, preparation of lowest bid document , entry of actual orders with actual prices negotiated, preparation of a ‘deviation document’ that will record all differences between lowest bid and actual orders. The entire system was built under text based UNIX and is being proposed to be changed to a GUI and windows based system. Draw data flow diagram (level 0, 1, 2, 3) and control flow diagram describing all details. --- (20 Marks)
2. (a) Explain Software Configuration Management in detail. --- (10 Marks)
(b) Compare and Contrast Coupling and Cohesion. --- (10 Marks)
3. (a) Explain risk identification, risk projection, RMMM plan in detail. --- (10 Marks)
(b) Explain how Gantt – chart can be used for planning and controlling small project with suitable example? What are the limitations of Gantt – chart? --- (10 Marks)
4. (a) Explain various steps involved in SRS for case study in question no. one. --- (10 Marks)
(b) What is feasibility study? Explain its type, contents and purpose. --- (10 Marks)
5. Explain the difference between: --- (20 Marks)
I. White Box and Black Box Testing.
II. Component Based Model and Spiral Model.
6. (a) Describe project scheduling and tracking with any suitable example. --- (10 Marks)
(b) Explain in detail software project plan with case study in question no. one. --- (10 Marks)
7. Write short notes on any two : - --- (20 Marks)
(a) CMM and Key Process Areas
(b) Security engineering
(c) Reengineering
(d) Design Concepts and Principles.