Software Engineering (SE), T.E. (I.T.), Semester 6, May 2011
(3 Hours)
[Total Marks:100]
N.B.: (1) Question no 1 is compulsory.
(2) Attempt any four questions out of remaining six questions.
(3) All questions carry equal marks.
1. (a) Explain Spiral Model. Compare and differentiate it with the sequential model. --- (10 Marks)
(b) Explain CMM along with the levels and activities within each level. --- (10 Marks)
2. (a) List down and explain software design principles. --- (10 Marks)
(b) List down different effort estimation techniques. Explain COCOMO in detail. --- (10 Marks)
3. (a) What do you understand by Quality Assurance? Explain the levels of quality assurance. --- (10 Marks)
(b) Explain risk analysis and management in detail. --- (10 Marks)
4. (a) Explain change control in detail along with software configuration items and baseline. --- (10 Marks)
(b) Explain requirement engineering. --- (10 Marks)
5. (a) Explain Basis path testing and cyclomatic complexity in detail. --- (10 Marks)
(b) What do you under stand by metrics? List down and explain process and project metrics. --- (10 Marks)
6. (a) List down and explain the activities of project scheduling and tracking. --- (10 marks)
(b) Explain agile methodology using SCRUM. --- (10 Marks)
7. Write short notes on any four: - --- (20 Marks)
(a) Re-engineering
(b) Software Project Planning
(c) Version Control
(d) Security Testing
(e) Software Design Document.
Also see Software engineering question papers for December 2011
No comments:
Post a Comment